Insight for OEMs, Machine Designers, and Industrial Equipment Manufacturers

• Power • Control • Data Connectivity • System Reliability • Physical Integrity

BLOG POSTS

Hot topics

What Changes in the Power Path When an AI Rack Pulls More Than 100 kW?
Three things change. The whip to the rack stops being a 30 A cord and becomes a 60 or 100 A listed assembly, and more of the room's ... Read more

Newest posts

What Changes in the Power Path When an AI Rack Pulls More Than 100 kW?
Three things change. The whip to the rack stops being a 30 A cord and becomes a 60 or 100 A listed assembly, and more of the room's ... Read more
Which Energy Code Requires Submetering on My Building, and What Does It Actually Require?
It depends on where the building is. In California the requirement is Title 24, Part 6, Section 130.5. In Nevada it is the 2024 IECC, ... Read more
What Tool Builders Asked at SEMICON West 2026
Three days at the Moscone Center, booth 6648, with the Brainboxes team. Thank you to everyone who stopped by. Most of the conversations at ... Read more